Week 13 was when my team and I started assembling the parts together, including drill-pressing the metal sheet on the drive bogie. We met at the Central Shop along with the bogie interaction team to see the progress of the drive bogie's metal sheets. After reaching out a conclusion of using collar shafts and screws to hold the shaft from unthreading itself, we have to drill several holes on the drive bogie's metal sheets to be able to implement our ideas. Hence, we met at Central Shop to start working on drilling the metal sheets. We measured out the dimensions and we started drilling. The dimensions that we went was exactly an inch, hence, we had to file some of the holes to make sure that the shaft fits through it. After filing, we tested and our shaft went through. The next thing that we are going to test is the screws on the drive bogie, collar shafts on the drive bogie, and the motor running on track.