Wednesday, March 20, 2019

Week 03/013 - 03/20

Week 6 of the meeting was mainly following up on our progress with the motor controller with the controls team. Other than that, we also talked about connector/adaptor for our controller. We received the Julet adaptor that we bought and gave it to the controls team so that they can proceed on testing the controller. Also, we plan out future plans once the controls team gave us feedback on the controllers. For me, I will be testing out the motor such as finding the voltage, current, torque, or power and plot them to a curve and match it with the datasheet.

Wednesday, March 13, 2019

Week 03/06 - 03/13

Week 5 of the meeting was mainly about presenting our first presentation. We covered topics about the future plan for the team, current progress, the budget of the team, etc. Before the presentation, during the week between 03/06 to 03/13, team and I had two meetings to complete the presentation and also work on the list Eric told us to do. We received our 3D printed case from the central shop but it did not fit on the motor. Hence, David from our team fixed the drawing so that the case, which is being manufactured by the central shop, can be fixed.

Week 02/27 - 03/06

Week 4 of the meeting was mainly to catch up with our team's progress. Initially, the first presentation will be held this week. However, due to career fairs, the presentation was postponed by a week. Hence, we did not really meet up for long in superway's meeting point because we decided to visit central shop to check on our 3D printed case. Other than that, we planned on meeting together to work on the presentation and make any other necessary changes to our project.