- Meet up with the team for #1 presentation
- #1 Presentation
- Follow up on the progress of the project
Completed assignment:
- Meet up for group meeting
- #1 Presentation
I met with two other of my team members for a group meeting to discuss future plans and start on presentation slides. The last member of the team stayed in contact through group message. We met in the library on 09/21.
Things did or discussed during the meeting:
- Future plans on how to execute the project
- Buy 4 motors from the vendor (Mac Motor)
- Open up the motor
- Design a single support shaft for the motor
- Design a housing for the motor
- Assembly and manufacture
- Finalize final product
- Mounting the motor to the bogie
- Makers Faire
- Finding suitable motors from different vendors for the project
- Finding the specifications of the motor
- Finish off the presentation #1
Next week assignment:
-TBA