Wednesday, September 26, 2018

Week 09/24 - 09/30

Next week assignment:
- Meet up with the team for #1 presentation
- #1 Presentation
- Follow up on the progress of the project

Completed assignment:
- Meet up for group meeting
- #1 Presentation

I met with two other of my team members for a group meeting to discuss future plans and start on presentation slides. The last member of the team stayed in contact through group message. We met in the library on 09/21.

Things did or discussed during the meeting:
-  Future plans on how to execute the project

  1. Buy 4 motors from the vendor (Mac Motor) 
  2. Open up the motor
  3. Design a single support shaft for the motor
  4. Design a housing for the motor
  5. Assembly and manufacture
  6. Finalize final product
  7. Mounting the motor to the bogie
  8. Makers Faire

- Finding suitable motors from different vendors for the project
- Finding the specifications of the motor
- Finish off the presentation #1

Next week assignment:
-TBA

Monday, September 24, 2018

Week 09/17 - 09/23


This week assignment:
- Follow up progress with the project
- Revise proposal
- Meet up for #1 Presentation on September 26
- Decide on specs of the motor

Completed assignment:
- Follow up on progress of the project
- Revise proposal
- Decide on specs of the motor

Next week assignment:
- Meet up with team for #1 presentation
- #1 Presentation
- Follow up on progress of the project

Wednesday, September 19, 2018

Week 09/09 - 09/16

Assignments of the week:
- Revised proposal
- Research about cooling system technique for heat dissipation.
- Update Team blog/Individual blog

Completed assignments:
- Revised proposal (met up with groupmates to do the assignment)
- Team blog
- Individual blog
- Researching about cooling system technique

  • Water cooling system
  • Air cooling system


Following week assignment:
- Follow up progress with the project
- ** September 26 -> #1 Presentation

Sunday, September 9, 2018

Week: September 02 - September 09

Assignments for the week:
- Lightning talk (5 mins per team)
- Project proposal

Completed assignments:
- Lightning talk -> in charged of flywheel section
- Project Proposal

Following week assignment:
- Follow up progress with the project
- ** September 26 -> #1 Presentation