On 10/22, I met with my other group members at the library to discuss what we are going to present during the presentation. Referring to the rubric and presentation 1's comment, we decided to add more detailed information about our project scope, including motor specs, vendors, kinematic simulations, and motor sizing and torque graphs. Other than that, we also believed that adding CAD drawing and FEA analysis in the presentation will provide better information to the audiences. Thus, 10/22 meeting involved contacting vendors for more detailed motor specs and work on presentation as much as we can.
On 10/23, our team met at the library to finish off the presentation. We worked on torque graphs, and Gantt chart. After meeting for a while, we went to the Spartan Superway Garage to meet with the Wayside and Control teams to discuss on motor specs as well as controllers for the motor. After meeting, we went to finish off CAD drawings to complete the presentation.
On 10/24, we presented the presentation.
Friday, October 26, 2018
Wednesday, October 17, 2018
Week 10/14 to 10/21
Before 10/17 meeting:
- I met with my groupmates to discuss motor sizing:
Since one of the requirements for makers faire is to let the chassis coast for 2 miles per hour for around 10 seconds, we tried to calculate the torque needed by our motor to accelerate the chassis. However, after doing some kinematic analysis, we believe that it might not possible for the chassis to coast for 10 seconds, accounting 2 seconds to accelerate to 2mph, and 2 seconds to decelerate to stop.
- We calculate the torque needed to be around 60 ft lb
- We also met up to do the team blog and plan on what to present on upcoming presentation #2
After 10/17 meeting:
-TBA
- I met with my groupmates to discuss motor sizing:
Since one of the requirements for makers faire is to let the chassis coast for 2 miles per hour for around 10 seconds, we tried to calculate the torque needed by our motor to accelerate the chassis. However, after doing some kinematic analysis, we believe that it might not possible for the chassis to coast for 10 seconds, accounting 2 seconds to accelerate to 2mph, and 2 seconds to decelerate to stop.
- We calculate the torque needed to be around 60 ft lb
- We also met up to do the team blog and plan on what to present on upcoming presentation #2
After 10/17 meeting:
-TBA
Week 10/07 - 10/14
Following up with the project, there were some topics brought up when my groupmates and I met each other. We mainly discuss our concerns regarding our desired motor from MAC motor. According to our motor sizing, since we would like to have a low RPM high torque motor, the motor provided by MAC will overheat in a few minutes. So, we came up with several lists of possible solutions such as having a planetary gearbox. We planned on decreasing the speed of the bogie, while increasing the speed of the motor to prevent the motor from overheating. With that said, we tried to research more about the planetary gearbox and what gear ratios we might need to slow down bogie while maintaining the ideal RPM for our motor.
We also discussed of having a controller that can adjust the voltage input of the motor.
Assignments:
- Follow up with vendor (MAC motor)
- Research more on controller ( example: KBL control)
- Research on the planetary gearbox and how to calculate them
- Sizing of motor
- Look into beadlock rim
- Research on Tesla pump for air cooling
Sunday, October 7, 2018
Week 10/01 - 10/07
This week's assignment:
- Meet up with group members to follow up on the project.
- Meet up with group members to do the team blog
- Meet up with group members to discuss the future plans of the project scope
On 10/01,
I met with two of my group members in the library to work on the:
- Meet up with group members to follow up on the project.
- Meet up with group members to do the team blog
- Meet up with group members to discuss the future plans of the project scope
On 10/01,
I met with two of my group members in the library to work on the:
- The team blog
- Discuss future plans of the project
- Work on motor requirements for other groups
- Discussing motor options for bogie
Future plans execution:
- Gather information of desired motor specs from MAC motor
- Finding sponsors to fund the motor
- Place order in for hub motor
- Decide on the motor (6 hub motors)
- Redesign the housing of the motor to fit better on the bogie
- Finalize on designs.
- Assembly and Manufacture.
- Finalize products on the bogie
- Makers Faire
Completed assignment:
- Team blog
- Follow up on project
Next week's assignment:
- TBA
Wednesday, September 26, 2018
Week 09/24 - 09/30
Next week assignment:
- Meet up with the team for #1 presentation
- #1 Presentation
- Follow up on the progress of the project
Completed assignment:
- Meet up for group meeting
- #1 Presentation
I met with two other of my team members for a group meeting to discuss future plans and start on presentation slides. The last member of the team stayed in contact through group message. We met in the library on 09/21.
Things did or discussed during the meeting:
- Future plans on how to execute the project
- Finding suitable motors from different vendors for the project
- Finding the specifications of the motor
- Finish off the presentation #1
Next week assignment:
-TBA
- Meet up with the team for #1 presentation
- #1 Presentation
- Follow up on the progress of the project
Completed assignment:
- Meet up for group meeting
- #1 Presentation
I met with two other of my team members for a group meeting to discuss future plans and start on presentation slides. The last member of the team stayed in contact through group message. We met in the library on 09/21.
Things did or discussed during the meeting:
- Future plans on how to execute the project
- Buy 4 motors from the vendor (Mac Motor)
- Open up the motor
- Design a single support shaft for the motor
- Design a housing for the motor
- Assembly and manufacture
- Finalize final product
- Mounting the motor to the bogie
- Makers Faire
- Finding suitable motors from different vendors for the project
- Finding the specifications of the motor
- Finish off the presentation #1
Next week assignment:
-TBA
Monday, September 24, 2018
Week 09/17 - 09/23
This week assignment:
- Follow up progress with the project
- Revise proposal
- Meet up for #1 Presentation on September 26
- Decide on specs of the motor
Completed assignment:
- Follow up on progress of the project
- Revise proposal
- Decide on specs of the motor
Next week assignment:
- Meet up with team for #1 presentation
- #1 Presentation
- Follow up on progress of the project
Wednesday, September 19, 2018
Week 09/09 - 09/16
Assignments of the week:
- Revised proposal
- Research about cooling system technique for heat dissipation.
- Update Team blog/Individual blog
Completed assignments:
- Revised proposal (met up with groupmates to do the assignment)
- Team blog
- Individual blog
- Researching about cooling system technique
Following week assignment:
- Follow up progress with the project
- ** September 26 -> #1 Presentation
- Revised proposal
- Research about cooling system technique for heat dissipation.
- Update Team blog/Individual blog
Completed assignments:
- Revised proposal (met up with groupmates to do the assignment)
- Team blog
- Individual blog
- Researching about cooling system technique
- Water cooling system
- Air cooling system
Following week assignment:
- Follow up progress with the project
- ** September 26 -> #1 Presentation