Week 10/14 to 10/21

Before 10/17 meeting:
- I met with my groupmates to discuss motor sizing:
Since one of the requirements for makers faire is to let the chassis coast for 2 miles per hour for around 10 seconds, we tried to calculate the torque needed by our motor to accelerate the chassis. However, after doing some kinematic analysis, we believe that it might not possible for the chassis to coast for 10 seconds, accounting 2 seconds to accelerate to 2mph, and 2 seconds to decelerate to stop.
- We calculate the torque needed to be around 60 ft lb


- We also met up to do the team blog and plan on what to present on upcoming presentation #2


After 10/17 meeting:
-TBA

Week 10/07 - 10/14

Following up with the project, there were some topics brought up when my groupmates and I met each other. We mainly discuss our concerns regarding our desired motor from MAC motor. According to our motor sizing, since we would like to have a low RPM high torque motor, the motor provided by MAC will overheat in a few minutes. So, we came up with several lists of possible solutions such as having a planetary gearbox. We planned on decreasing the speed of the bogie, while increasing the speed of the motor to prevent the motor from overheating. With that said, we tried to research more about the planetary gearbox and what gear ratios we might need to slow down bogie while maintaining the ideal RPM for our motor. 

We also discussed of having a controller that can adjust the voltage input of the motor. 

Assignments:
- Follow up with vendor (MAC motor)
- Research more on controller ( example: KBL control)
- Research on the planetary gearbox and how to calculate them
- Sizing of motor
- Look into beadlock rim 
- Research on Tesla pump for air cooling

Sunday, October 7, 2018

Week 10/01 - 10/07

This week's assignment:
- Meet up with group members to follow up on the project.
- Meet up with group members to do the team blog
- Meet up with group members to discuss the future plans of the project scope

On 10/01,
I met with two of my group members in the library to work on the:
    • The team blog
    • Discuss future plans of the project
    • Work on motor requirements for other groups
    • Discussing motor options for bogie
Future plans execution:
  • Gather information of desired motor specs from MAC motor
  • Finding sponsors to fund the motor
  • Place order in for hub motor
  • Decide on the motor (6 hub motors) 
  • Redesign the housing of the motor to fit better on the bogie
  • Finalize on designs.
  • Assembly and Manufacture.
  • Finalize products on the bogie
  • Makers Faire
Completed assignment: 
- Team blog
- Follow up on project

Next week's assignment: 
- TBA

Wednesday, September 26, 2018

Week 09/24 - 09/30

Next week assignment:
- Meet up with the team for #1 presentation
- #1 Presentation
- Follow up on the progress of the project

Completed assignment:
- Meet up for group meeting
- #1 Presentation

I met with two other of my team members for a group meeting to discuss future plans and start on presentation slides. The last member of the team stayed in contact through group message. We met in the library on 09/21.

Things did or discussed during the meeting:
-  Future plans on how to execute the project

  1. Buy 4 motors from the vendor (Mac Motor) 
  2. Open up the motor
  3. Design a single support shaft for the motor
  4. Design a housing for the motor
  5. Assembly and manufacture
  6. Finalize final product
  7. Mounting the motor to the bogie
  8. Makers Faire

- Finding suitable motors from different vendors for the project
- Finding the specifications of the motor
- Finish off the presentation #1

Next week assignment:
-TBA

Monday, September 24, 2018

Week 09/17 - 09/23


This week assignment:
- Follow up progress with the project
- Revise proposal
- Meet up for #1 Presentation on September 26
- Decide on specs of the motor

Completed assignment:
- Follow up on progress of the project
- Revise proposal
- Decide on specs of the motor

Next week assignment:
- Meet up with team for #1 presentation
- #1 Presentation
- Follow up on progress of the project

Wednesday, September 19, 2018

Week 09/09 - 09/16

Assignments of the week:
- Revised proposal
- Research about cooling system technique for heat dissipation.
- Update Team blog/Individual blog

Completed assignments:
- Revised proposal (met up with groupmates to do the assignment)
- Team blog
- Individual blog
- Researching about cooling system technique

  • Water cooling system
  • Air cooling system


Following week assignment:
- Follow up progress with the project
- ** September 26 -> #1 Presentation

Sunday, September 9, 2018

Week: September 02 - September 09

Assignments for the week:
- Lightning talk (5 mins per team)
- Project proposal

Completed assignments:
- Lightning talk -> in charged of flywheel section
- Project Proposal

Following week assignment:
- Follow up progress with the project
- ** September 26 -> #1 Presentation